ORBITA HIT
Member
Hello, I wanted to ask how to do the following:
How can I load at one time, for example, Saturdays at 00:15 a programming file for example (weekend.sdl) and on a Monday at 08:15 load a different configuration, for example (announcers.sdl)
I don't see a way to do it.
What I intend is to have different configurations loaded in the programmer, as it suits me.
For example, it can also be used for when the radio goes on vacation and only music and advertisements remain.
In other words, one day at 02:00 it loads the configuration of (holidays.sdl) and within 1 month when the programming returns, have programmed one day at 08:15 the programming with the file (announcers.sdl)
all this in the event scheduler.
all this is to configure and not have to manually upload the different files.
Thank you
How can I load at one time, for example, Saturdays at 00:15 a programming file for example (weekend.sdl) and on a Monday at 08:15 load a different configuration, for example (announcers.sdl)
I don't see a way to do it.
What I intend is to have different configurations loaded in the programmer, as it suits me.
For example, it can also be used for when the radio goes on vacation and only music and advertisements remain.
In other words, one day at 02:00 it loads the configuration of (holidays.sdl) and within 1 month when the programming returns, have programmed one day at 08:15 the programming with the file (announcers.sdl)
all this in the event scheduler.
all this is to configure and not have to manually upload the different files.
Thank you