Scheduling series

When scheduling programs in a series from a folder, we often repeat each program once more within the same week, after which we run the series advance command. This works fine, but everything resets to the first file in the series if we have to reboot RB or do an upgrade. Is it possible for RB to store the current series status so this can be prevented? Restoring several programs by deleting the already played members of the series (and checking the number in the series via the reports) is inconvenient and time-wasting. Is the status information stored in the library database?
 
Back
Top